Project Details


New Facility for the Society for the Prevention of Cruelty to Animals (SPCA) St. John’s Animal Shelter. The Facility is approximately 11,000 sq. ft. and could be wood frame, non-combustible construction such as steel / concrete frame or possibly Concrete Tilt-Up Construction.

 

Construction scheduled to start April 2023.

View Our Work

Our projects include everything from residential to industrial. Our ability to excel in a variety of fields is what has set us apart and created the legacy that Allied has in the construction industry.

View Projects